Ski Resorts News
12/30/2020
The biggest investment in the Kreischberg history will be made in 2021: The gondola lift for up to 6 passengers (built in 1992) will be replaced with a new gondola lift for up to 10 passengers. This will be a 40 million Euro investment which includes the gondola lift and new buildings for valley-, middle-, and mountain stations.

This new Doppelmayr gondola lift can transport up to 3.000 people per hour from the valley to the mountain station. The old 6 passenger gondola lift is able to transport 2.000 people per hour.
Lots of preparations have been made and will soon be completed. The gondola agency has received all plans and documents. Building negotiations will be made this year still.
2021 will be a busy year for the team. Right after the end of the season on April 5th, the 6 passenger gondola lift will be taken down. Afterwards, new valley-, middle-, and mountain buildings will be constructed and finally the new gondola lift will be build. There is a strict time schedule for this project because the new gondola lift will start operating at the beginning of December 2021.
Facts: New Kreischberg gondola lift
Length: 3,8km 903m of height difference between valley- and mountain station
Valley station: 868m altitude
Middle station: 1.441m altitude
Mountain station: 1.771m altitude
There will be 181 gondolas for up to 10 passengers
Capacity: 4.000 passengers per hour
Valley station: 868m altitude
Middle station: 1.441m altitude
Mountain station: 1.771m altitude
There will be 181 gondolas for up to 10 passengers
Capacity: 4.000 passengers per hour
www.kreischberg.at
Latest Resort News
Schilthornbahn: World`s steepest cableway is open!
The world's steepest cable car starts operating. The new direct connection between Stechelberg and Mürren was officially opened the day before as part of a VIP opening ceremony. At the same time, the first section of the cable car between Mürren and Birg will go into operation.
12/15/2024
The new Plateau chairlift will enrich the Kronplatz ski area
Kronplatz, one of the premier ski destinations in the Dolomites, has introduced a state-of-the-art 8-seater chairlift named Plateau for the 2024/25 winter season. Located in the Olang sector, this new chairlift replaces the previous 4-seater, offering a significant upgrade in comfort and efficiency.
11/28/2024
Gourette ski area modernization
Gourette ski resort in the French Pyrenees has undergone significant modernization efforts for the 2024/2025 season. These upgrades aim to improve accessibility, efficiency, and the overall skiing experience. This new project, presented on September 5th...
11/20/2024